Grilling & Recipes: Suggestions?
(Kolob Reservoir Specific)
1 messages
Updated 7/19/2021 12:52:28 PM
Lakes Online Forum
84,091 messages
Updated 11/8/2024 10:28:12 AM
Lakes Online Forum
5,204 messages
Updated 9/14/2024 10:10:50 AM
(Kolob Reservoir Specific)
0 messages
Updated
Lakes Online Forum
4,172 messages
Updated 9/9/2024 5:04:44 PM
Lakes Online Forum
4,262 messages
Updated 11/6/2024 6:43:09 PM
Lakes Online Forum
2,979 messages
Updated 6/26/2024 5:03:03 AM
Lakes Online Forum
98 messages
Updated 4/15/2024 1:00:58 AM
|
|
|
Here is a picture in progress. First we reinforced the joists and sloped the framing while doing so.Then primed 3/4 inch tongue and grove plywood was screwed down. plywood was covered with roofing felt. 5/8" Durock was layered over felt and screwed down. Joints were taped and a layer of thin set was added. Thin set was painted with a rubber type coating made for tile wet areas and showers (providing a water tight barrier). Tile was set directly on the coating and grouted.
Below is the finished product
|
|