Forum Thread
(Calaveras Lake Specific)
0 messages
Updated
Lakes Online Forum
84,091 messages
Updated 11/8/2024 10:28:12 AM
Lakes Online Forum
5,204 messages
Updated 9/14/2024 10:10:50 AM
(Calaveras Lake Specific)
0 messages
Updated
Lakes Online Forum
4,172 messages
Updated 9/9/2024 5:04:44 PM
Lakes Online Forum
4,262 messages
Updated 11/6/2024 6:43:09 PM
Lakes Online Forum
2,979 messages
Updated 6/26/2024 5:03:03 AM
Lakes Online Forum
98 messages
Updated 4/15/2024 1:00:58 AM
Calaveras Lake Photo Gallery





    
Name:   lucky67 - Email Member
Subject:   Ala Power licensing
Date:   3/10/2017 4:56:08 PM

received CERTIFIED LETTER saying I had one or more unpermitted structures ; the enclosed color aerial photo, showed my boat house, pier & floanting pier, ( all constructed in 2007,permitted & inspected, ); the photo showed all structures with the legend " Permitted called, called, called--so today went by office--nice lady said hundreds of letters just like mine went out when there was no problem





Name:   Lifer - Email Member
Subject:   Ala Power licensing
Date:   3/10/2017 6:40:31 PM

One of my neighbors got one of those but the pictures were of another neighbors place. My nephew is building now and the permit folks told him they photograph every inch of shoreline every year.





Name:   Talullahhound - Email Member
Subject:   Ala Power licensing
Date:   3/10/2017 10:01:58 PM

Why does this not surprise me...I'm surprised I haven't gotten one yet, since they changed and changed our boathouse design.  Even when they told our architect that it was fine, it wasn't

.





Name:   weagle74 - Email Member
Subject:   Ala Power licensing
Date:   3/13/2017 9:34:59 AM

I also received a certified letter Friday. After reading the letter again this morning, it would appear that there is no action required, but rather they are establishing a base line for your waterfront. Their enclosed picture identified all waterfront structures even including my yard pump, old sidewalk, and a temporary wooden kayak rack sitting on my ramp, all of which they labeled "legacy structures." I called Rhett for confirmation of this, but he is probably just swamped with calls. Not sure why the need to send these as certified mail. Sure, it got my attention, but I think it is also causing unecessary angst.





Name:   Osms - Email Member
Subject:   Ala Power licensing
Date:   3/13/2017 10:31:04 AM

I think what we're seeing with the photos and certified letters is APCO playing catch up with the FERC regulations.  During the relicensing there were some filings by both parties concerning the lack of records and approvals for shoreline developments.  APCO's records did not have many of the old structures that were built before formal approvals were required, so now they are recording everything with photos.  If the structure went thru the approval process, you shouldn't get the certified letter.





Name:   alatraveler50 - Email Member
Subject:   Ala Power licensing
Date:   3/17/2017 9:45:21 AM

We got our letter last summer.  Basically all they are doing is making you fill out a new permit form that includes anything that was not on your old permit.  If an item is marked "Legacy" you don't have to do anything with it as long as you have not changed it.  Be aware that the latest permits have restrictions that were not on the permit we submiited about 6 years ago.  We had a few of those and Apco marked them "Legacy".  Their way of knowing that it was allowed prior to current regs.









Quick Links
Calaveras Lake News
Calaveras Lake Photos
Calaveras Lake Videos




About Us
Contact Us
Site Map
Search Site
Advertise With Us
   
Calaveras.LakesOnline.com
THE CALAVERAS LAKE WEBSITE

Copyright 2024, Lakes Online
Privacy    |    Legal